After 2 coats of epoxy and endless coats of varnish as well as two coats of white paint, our new mast and all the antennas were ready to be fitted. We will eventually have AIS, VHF, GPS and AM/FM/DAB radio. The mast is designed to be lowered onto the front deck so we can fit under bridges and the fittings allow the AIS and VHF to remain upright when the mast is down.
Back to All Events
Earlier Event: June 26
Not on the boat, but still doing boat work
Later Event: August 7
Generator Day